New ways of employing rural road maintenance personnel
wangkiky 3084 | ||
February 24 evening 9:30, located in Zhang Zizhong Road and Jilin Road intersection near the road construction site to see the construction workers are loose on the road to refurbish. From the Municipal Transportation Commission learned that, due to the average daily temperature in Tianjin will reach below 0 ℃, the soil began to freeze until the turn of second and third months of permafrost can melt all. In the process of warm soil warming soil, the road will appear pits,[url=http://chipspreadermarket.com/road/3224.html]cost to repave driveway asphalt[/url] loose, fudge and other spring disease. For the public to travel to provide a satisfactory travel environment, with immediate effect of the city's urban road maintenance work to repair the work of the spring of small repair as a starting point.
City Traffic and Transportation Committee Road Facilities Management Office Deputy Director Zhu Changjun introduction, February 20 City Municipal Transportation Commission to the municipal bridge and the city six districts, four districts around the city built capacity and other 11 city road maintenance department issued On the strengthening of spring mud disease road repair work notice, requiring all units in the traffic survey on the basis of the end of February to eliminate the formation of the bridge deck pavement,[url=http://chipspreadermarket.com/road/3371.html]affordable concrete cutting machine price[/url] loose and fog and other spring disease. As of 20 this month, the statistics, involving more than 800 spring disease, an area of 4300 square meters. By the impact of snowfall the day before night, the road by the brine erosion, will be a further occurrence of similar diseases, we through the secondary inspection platform to keep abreast of the road disease dynamics in a timely manner to start the spring melt disease repair, is expected in mid-March to be warm after the warm Started this year's small maintenance work. In addition, there are some built in Tianjin, not transferred, social property and other facilities, we will actively coordinate the relevant departments, responsible units pay close attention to maintenance, and strive for the people to provide a satisfactory travel environment. It is reported that this work will take the winter construction measures, cold feed for maintenance, to avoid the formation of hot materials at low temperatures caused by paving asphalt oil and roadbed can not reach the degree of adhesion immediately after the phenomenon caused by loose,[url=http://chipspreadermarket.com/road/3860.html]repair asphalt cracks machine[/url] to ensure the construction quality The At the same time, the municipal management system will also strengthen the daily road traffic inspection efforts, through the secondary inspection platform on the basis of the relevant personnel to take turns to patrol road conditions to improve the timely detection of disease. |