The pioneer in the snow

 
wangkiky 3081
Day, most of the Haixi territory suffered heavy snowfall, Hercynian highway section immediately start disaster weather emergency plan,[url=http://roadcuttingmachine.com/blog/1501.html]cement pavement hammers[/url] requiring all units to further strengthen the spring road maintenance and management work, for the masses to provide a safe and smooth road traffic environment The.
1. To strengthen the national highway trunk road pavement disease disposal, timely detection and elimination of road safety hazards; is to effectively strengthen the road traffic fog, rain, snow, low temperature freezing and other severe weather forecast warning,[url=http://roadcuttingmachine.com/blog/4866.html]What Method Of Cutting Road[/url] timely to the public to provide early warning information and travel safety warning;
2. is to do a good job in the spring rain and snow under the road through the road through the work, clear all types of highway operating standards and time requirements, highway and provincial trunk road in principle should be used mechanical snow removal. Is to do a good job on duty and information reporting work,[url=http://roadroutercrack.com/blog-new/7865.html]Anti rain series compactor plate[/url] adhere to the implementation of 24 hours on duty system, there is danger immediately reported. Pay attention to highway access matters, and actively guide the masses to arrange travel time, route, to ensure road safety and smooth.
Terms & Conditions | Privacy Policy |
Feedback
|
Submit Info