Emulsified Asphalt in Road Maintenance

 
wangkiky 2874
Machine is becoming old, relevant planning is not reasonable: limited the expanse and cost saving, the current machines are using is still very old, some are even nearby retirement. Quality of machinery can not reach the relevant requirements, its efficiency naturally can not raise Up, so in real life mechanical worker strike has occurred times to time, which resulted in the road maintenance results.
In addition, since the professional quality of related management person is too low, so the configuration of road maintenance machinery are often not getting long-term planning, irrational allocation and mismatch of used power are not match has occurred often, which caused the high rite In maintenance machinery and low efficiency of maintenance work from the other side. Finally, there is a phenomenon, most of machine at this stage is for repairing the road.
It is very low to see the entire roadbed andiling system, and this is a direct result for not overall improvement of road maintenance, and maintenance effect becoming not well natural.




Terms & Conditions | Privacy Policy |
Feedback
|
Submit Info