Wood flooring in the laying of the package must be removed before, and then ventilated environment to dry. At least a week, this is to adapt the wood floor from the factory to the decoration of the micro-climate. Then, the construction team should carry out the following steps: 1. First the ground clean. 2. Make sure the floor is dry. 3. Hit a layer of asphalt layer. There are asphalt sold on the market, no need to burn with asphalt block. The reason for this is to protect against moisture and insects.
4. Play the bottom plate: 9 plywood can generally be used, it was 12%. 9 PCT board must be cut into four laying, each piece should have a gap of one centimeter. And then with the nails to the board and the ground fixed. In this case,
5. Laying the log floor. With a nail to fight on the four sides of the board, note that each board can only use two small white latex. Because the white latex is water-based, too much will make the wood damp arch. 6. Sanding the floor. At least three times. The second time more than polished down the wood powder to be retained. 7. Fill the gaps between the boards with the remaining wood chips. 8. on the wood floor oil. At least three times.
Related links:
[url=http://cheapoutdoorflooring.com/boat-deck/2051.html]Anti Slip Strips for Decks[/url]

[url=http://cheapoutdoorflooring.com/wall-panel/2845.html]exterior wood plastic laminates[/url]

[url=http://cheapoutdoorflooring.com/boat-deck/4750.html]Supplier for Wooden Picket Fence Panels in Dubai[/url]
Terms & Conditions | Privacy Policy |
Feedback
|
Submit Info