technology knowledge
wangkiky 2632 | ||
to the grading line position of the hanger hanger to be inserted nut, screw nut. 4. Keel connected: assemble connector, cable arch and straight elevation adjustment. The installation of additional keel hole. According to the corresponding node construction, Atlas
connection card set. 6. Fixed keels, the nail is fixed, there is no design requirement of nail spacing is 1000mm. 5 installation of the keel: 1. Press to play good in the keel of the line, card hanging in the keel hanging pendant. II. The middle hanging keel: according to the requirements of the design of the keel spacing will keel through the hanger, hanging in the keel, no design requirements, the general spacing is 500~600mm. The keel length. Among a plurality of continue to take a long time, in connection with the keel, keel [url=http://wooddeckingwholesale.com/composite-floor/2938.html]pallet floor outdoor[/url] [url=http://wooddeckingwholesale.com/composite-floor/2937.html]finding cheap in ontario[/url] [url=http://wooddeckingwholesale.com/composite-floor/2936.html]tongue and groove composite porch decking cost[/url] |