Fiber Sealing Technology

 
wangkiky 2358
Process principle: fiber sealing technology refers to the use of fiber core equipment at the same time sprinkle (sprinkle) cloth asphalt binder and glass fiber, and then in the above crushed stone crushed by the formation of new wear layer or stress absorption of the middle layer A new type of road construction and maintenance technology.
Process Overview: fiber sealing construction, after a special process of cutting broken fibers in the upper and lower layers of uniform distribution of asphalt binder was chaos to evenly distributed, overlapping each other, and the formation of network asphalt mixture winding structure,[url=http://roadroutercrack.com/blog-new/4716.html]Anti rain series road concrete milling machine[/url] effectively improve The tensile, shear, compressive and impact strength of the seal layer were measured. Similar to the new road between the primary and the surface layer or the original pavement on the basis of a layer of high elasticity and high strength protective mat. Especially for the old asphalt pavement (or new roadbed), the surface layer between the stress absorption intermediate layer construction, and the old asphalt pavement wear layer construction. The old and new asphalt road construction and conservation play an effective protective effect, but also extend its maintenance cycle and service life.
 

Supporting the use of equipment: 1 fiber-sealing equipment, insulation asphalt tankers, gravel spreaders, tire rollers,[url=http://roadroutercrack.com/blog-new/2580.html]affordable road resurfacing machine distributors[/url]

Construction of raw materials: modified emulsified asphalt, basalt fiber and gravel

Construction process: by a bit of asphalt filled with asphalt insulation trailer fiber sealing equipment for two layers of asphalt spray → gravel spreader follow up the fiber sealing equipment for gravel spreading, stone spreading should be completed before the asphalt demulsification → Spread a gravel,[url=http://roadroutercrack.com/blog-new/2122.html]cheap high efficient power trowel[/url] should immediately follow up with roller tire roller rolling operations, rolling 2-3 times → sweep the road to clean up the remaining gravel can be fully open after the recovery of traffic.
Terms & Conditions | Privacy Policy |
Feedback
|
Submit Info