construction to lay
wangkiky 2331 | ||
generally between 0.8mpa-1.0mpa appropriate. 14, the drainage pipe installation Note drainage pipe horizontal pipe should have a certain degree of slope, the socket connection tight to ensure that no leakage. Fixed pipe bracket, elevator spacing reasonable, solid. 15, the installation of sanitary equipment Location of sanitary appliances
should be accurate, support, bracket installation flat, solid. Floor drain should be installed at the lowest point of the ground, and concave ground 5mm. Toilet with the ground or nozzle connection Seal with sludge or silica gel, should not use cement, cement will swell the bottom of the toilet crack damage. 16, the direction of hot and cold water faucet cold, hot water faucet in the faucet should be installed on the left. Electric water heater grounding protection device should be used at the beginning of the gallbladder should be excluded from the air, filled with water before starting power. Read the small family to share the sixteen water and electricity installation knowledge, I believe you [url=http://compositedeckingforsale.com/wood-floor/6529.html]wood plastic conductive polymer composite[/url] [url=http://compositedeckingforsale.com/wood-floor/11312.html]outdoor pavillion kits discount[/url] [url=http://compositedeckingforsale.com/wood-floor/12070.html]pre cut stair composit stringers[/url] |