Small vibrating roller method of operation
wangkiky 1234 | ||
(1)Check if the working body and sturdy parts is intact.
(2) Start the engine by commissioning confirmed normally and the braking, steering with other agencies are working well , roller operation can be carried out. (3)Tire roller need to adjust the tire pressure to the required operating pressure range, all the tires pressure confidential agreement. (4)By increasing or decreasing the weight method, to adjust the operation pressure is to a predetermined value. (5)Initial pressure on the soft embankment and hillside area shall survey the construction site before work. (6)It need to be compacted from the middle of the road during compaction new roads. Note that, during the compaction process, do not get too close to the edge of the embankment, the best control in controlling the distance of 0.5 meters. If it too close to the edge, prone to collapse situation. (7) During the compaction process, it can not be for the sake of convenience to hang other machinery back of a small roller. (8)During the compacted, we make sure that there is no obstacle at work environment also without any irrelevant personnel to avoid accidents. (9)Before starting a small roller, it also need to check the corresponding index and components to see if there is any loose or damaged occurs. In this way.Not only to ensure efficiency, but also provide a guarantee for our own personal safety . (10)During operation, if you need to change the direction , you need to turn off the vibration switch. The direction can be changed untill the wheel stops. Related Sites: [url=http://roadcuttingmachine.com/blog/2395.html]Cement Road Humidifier Applications[/url] [url=http://roadcuttingmachine.com/blog/803.html]material cost road[/url] [url=http://roadcuttingmachine.com/blog/3418.html]Pothole Repair Aging Machine Parts[/url] [url=http://roadcuttingmachine.com/blog/1414.html]large crack sealer[/url] |