Enhance the effectiveness of the railway project
wangkiky 911 | ||
"According to 'Five' requirements of the building construction, the project resident construction, concrete mixing plant, precast beam field, site laboratory facilities and other large temporary investment more than double than ever before, we put in a 800 unit project million. "secretary of the Ministry of project Liushou Xian told reporters," these measures, but also to further standardize the construction management, strengthen the process control, improve project quality, guarantee safe and civilized construction plays an important role. " It is understood that the Ministry of the construction project plan, resource allocation, mechanical entry and exit, including materials stacking and marked signs of settings, all in accordance with "five" requirements, strict implementation of the relevant standards. Especially for precast beam field, steel processing workshops and other places, the project is of high standards and strict requirements. In order to achieve concrete mixing concentrated, centralized processing steel, precast slab focus to achieve the construction of local conditions "factory", the project spent more than 200 million, the purchase of intelligent tensioning machine, intelligent grouting machine, CNC bending machine, straightening and cutting intelligent machine, CNC vertical steel processing center, automatic rolling machine, CNC machinery boilers and other smart devices not only improve the work efficiency, but also good to avoid the quality defects manual may bring. Related Sites: [url=http://cracksealingmachine.com/road-machine/3035.html]how to use an easy out tool[/url] [url=http://cracksealingmachine.com/road-machine/2402.html]die cutting machine for sale in uk[/url] [url=http://cracksealingmachine.com/road-machine/3445.html]asphalt repair machine technology[/url] [url=http://cracksealingmachine.com/road-machine/2580.html]types of slurry crack sealing[/url] |