How potting road construction

 
wangkiky 691
Construction technology on pavement pouring glue mainly include slotted, clear joints, pouring. Of course, three simple looks simple, but the details of which aspects need attention. mainly include:
Clean seam.
First, with clear saw clear sew seams of sand, mud coagulation, greater than 0.5mpa use compressed air, the elimination of seams dust and other contaminants to ensure clean and dry joints and internal wall, wall joints checks to wipe dust is not pouring criteria.
Taping. Both sides of the seam taped to prevent pollution pouring glue overflow pavement. Ingredients from full-time staff according to technical requirements and the ratio of ingredients, mix well. Pouring can not be filled once, 2-3 times.
Zhaobu on the site have not filled Zhaobu personnel Zhaobu. Clean up the site, and other coagulation after pouring glue for the excess overflow To clear the road to keep clean.
Construction period negotiated by the two sides A and B requires staffing and adjust the speed of construction. Construction quality construction standards in strict accordance with the Ministry of Transportation road construction.

Related Sites:
asphalt pavement router
Compactor roller
Drummed Asphalt Decanting Equipment
powerful road pneumatic air leg rock drill
Terms & Conditions | Privacy Policy |
Feedback
|
Submit Info